|
on 11/6/09
little by littleSo I've done the log notes and I am half way through do the summury of each tape on a card. I am getting a better idea of the material now. I have been thinking about my next step. Considered doing two paper edits...Read more » Project: The Quest Bike Status: Post-Production |
|
|
on 28/5/09
system reboot<!-- @page { margin: 2cm } P { margin-bottom: 0.21cm } --> So the editor/ visual effects guy had some computer issues which have been mainly sorted now. His system is back up and running. There is still an iss...Read more » Project: Demonic Dome Status: Post-Production |
|
|
on 28/5/09
system rebootopps, double post, please delete...Read more » Project: Demonic Dome Status: Post-Production |
|
on 28/5/09
Almost, almost<!-- @page { margin: 2cm } P { margin-bottom: 0.21cm } --> So yes, I have almost finished the logging. Its taken longer then I hoped for, but I seemed to rush things if I did it for a few day's in a row. Found...Read more » Project: The Quest Bike Status: Post-Production |
|
|
on 2/5/09
Editing in hell<!-- @page { margin: 2cm } P { margin-bottom: 0.21cm } --> Well maybe not. Demonic dome is a project that myself and Yuri are working on. We met in college and continued to work together since then. The genesi...Read more » Project: Demonic Dome Status: Post-Production |
|
on 2/5/09
Slowly Onwards<!-- @page { margin: 2cm } P { margin-bottom: 0.21cm } --> The progress has been slow and steady. Still logging away. I have also been thinking about the bigger picture. For one most of the shooting takes plac...Read more » Project: The Quest Bike Status: Post-Production |
|
on 22/4/09
Post Production joys!!<!-- @page { margin: 2cm } P { margin-bottom: 0.21cm } --> So way hey my first blog post here. The filming is over and the footage clocked in at around 33 hours in total. So the second toughest job is in front...Read more » Project: The Quest Bike Status: Post-Production |
The Quest Bike
Status: Post-ProductionOld Skool Motorbikes made a custom chopper motorbike for the Toys for big Boys show and the AMD biker build off competition. This follows the project ...
Demonic Dome
Status: Post-ProductionA fantasy/moral story about what drives people to do bad things. With demons and criminals up to no good. ...
ABBEYFEST - The Movie
Status: Pre-ProductionThe doco will be a mish mash of all the media we can get our hands on, including interviews with all the parties involved....
24 hour film experiment
We are dedicated to developing and delivering high quality films in 24 hours or less. This is a reaction to the slow drawn out process of creating h...
SHE-D
SHE-D is a multi-functional installation piece in itself, as well as a large multi-functional space suitable for making and presenting multi-disciplin...




© 2009 Crewger